DATIMORE · WEB-047

Warehouse-readiness checklist and worked history

Use this worksheet to keep a useful reporting history with a setup your team can maintain. Complete it with the business owner and the people responsible for the source systems.

Synthetic planning example, not a client case or a working integration. The records and results below are invented to explain the method. This static worksheet does not load data, preserve history or enforce permissions.

Recurring comparison / people who need it:

Source systems / history required:

Business owner / backup / review date:

1. Decide what needs to stay available

History

Which past states or changes must the report explain? How long must they remain available? Check whether each source already retains them. A new warehouse cannot recreate missing past records.

Evidence / named owner:

Ready / Open / Unknown — next action and date:

Sources and shared definitions

List each source, the matching identifier and the agreed calculation. Confirm that exports cover the same cutoff and include every required record. Name who approves changes to definitions.

Evidence / named owner:

Ready / Open / Unknown — next action and date:

Completeness and update timing

Agree a reporting deadline and the last complete period. State what happens when a source is late or an identifier is missing. A completed transfer alone does not prove that the figures are complete.

Evidence / named owner:

Ready / Open / Unknown — next action and date:

Access

Name who may view detail, change matching rules and approve a period. Limit stored data to what is needed. Confirm access and retention requirements with the people responsible.

Evidence / named owner:

Ready / Open / Unknown — next action and date:

Ownership and recovery

Name the owner and backup for each source and the report. Decide who investigates failed updates, checks corrections and restores a saved copy. Plan a recovery check before relying on the setup.

Evidence / named owner:

Ready / Open / Unknown — next action and date:

Cost and skills

Compare storage, data transfers, reporting access and maintenance effort for both options. Name who has time and skills to maintain each one. Record assumptions and obtain current costs for your own scope.

Evidence / named owner:

Ready / Open / Unknown — next action and date:

2. Choose the smallest suitable setup

A report inside one system can serve a current operational question. A small shared dataset with agreed calculations can combine a few sources when the required history is retained and updates are manageable. Consider a warehouse when saving and reusing history across systems and reports becomes recurring work. Source count or company size alone is not a threshold.

Proposed option / why the smaller option is or is not sufficient:

Do not treat this as a points-based score. An unknown source, unclear owner or missing permission needs an answer before the affected data is used. Pilot one reporting question, then review the evidence before expanding.

3. Follow the saved records

Synthetic distributor, one product, units rather than money. At each month-end, both systems provide one complete record per order. Dispatch records show the total sent up to that date. There are no cancellations, returns, multiple identifiers for the same order or duplicate rows. The dispatch source explicitly confirms quantities, including zero; missing information is not zero.

Two separate source exports, aligned here by cutoff and order number
CutoffOrder numberOrder source: units orderedDispatch source: cumulative units sent
30 September 2026A2012
30 September 2026B1515
31 October 2026A2020
31 October 2026B1515
31 October 2026C104

For each cutoff, match on order number, subtract cumulative dispatched units from ordered units, then add the outstanding quantities. Keep the dated input copies and the approved result. Do not add the two months together: these are states at two dates, not monthly shipments.

September: (20 − 12) + (15 − 15) = 8 units outstanding.

October: (20 − 20) + (15 − 15) + (10 − 4) = 6 units outstanding. September stays at 8.

4. Try an incomplete input

In the October dispatch export, replace the order number C with a blank while keeping its quantity of 4. The rule can no longer connect that shipment to an order. The October total stays provisional; it must not be approved as 10 by ignoring the unmatched shipment. The dispatch owner checks the source, confirms C and corrects its identifier. Keep the received copy and the corrected version with the reason and approval time. Rechecking yields October 6; the separate September record remains 8.

Expected checks before approving the example

These are small paper rules. Real systems need checks for cancellations, returns, duplicate records, source changes, simultaneous updates, access and recovery. The warehouse does not perform these checks merely because it stores the data.

5. Minimal source-to-report architecture

Six stages: source systems, dated copies, completeness and matching checks, approved warehouse history, shared calculations, and reports. Unresolved inputs keep affected totals provisional.
Conceptual synthetic flow. The named source owner corrects exceptions before the affected period is approved. Set access, update deadlines and maintenance ownership across the whole path. This does not select a product or provide a deployable design.

Download the editable draw.io SVG

Microsoft’s cited small/medium business design is for modernizing an existing warehouse. It explicitly excludes building a new warehouse from scratch; do not copy it as a default first-warehouse architecture. Microsoft architecture and its exclusions.